Captured retroactively. This represents pre-platform infrastructure setup work that pre-dates the platform. The credit value is a post-hoc estimate per the methodology in Entry 017 and is subject to revision under G-038's calibration mechanism. The Brandon allocation here is intentionally conservative — please correct on login if it under- or over-states actual involvement.
What this represents
The boring-but-load-bearing setup work that any later contributor takes for granted:
- Domain registration for the OLN identity.
- Hosting account provisioning (Supabase project, deployment platform, DNS configuration).
- Initial repository scaffold with the directory structure, gitignore, TypeScript config, ESLint config, Tailwind config that the Phase 1 ship inherited from rather than created.
- Local development setup including the Supabase CLI configuration that lets migrations run locally.
- Whatever billing accounts had to be opened to make the above function.
Why this is on the roadmap
It's small in credit value but real in time spent. Without it, P-006 (the Phase 1 ship) would have started from a blank directory rather than from a configured project. Naming it as its own retroactive entry is what makes future contributors who do similar setup work see that this kind of work is on the ledger.